RM新时代登录网址

    1. <strong id="ssxhz"><i id="ssxhz"><label id="ssxhz"></label></i></strong>

      <form id="ssxhz"></form>
    2. <label id="ssxhz"></label>

      Reverse osmosis project of a A-share listed enterprise in QinghaiReturn


      Project Name: reverse osmosis operation guarantee project of a A-share listed enterprise in Qinghai

      Project process: heating + stack filtration + ultrafiltration + primary reverse osmosis + secondary reverse osmosis + EDI

      Water yield: 4000m 3/ h

      Water source: groundwater

      Service time: since 2013


      System operating conditions

      Dosing scheme:


      Chemical name

      model

      dosage(mg/l)

      Dosing mode

      Reverse osmosis scale inhibitor 8x concentrate

      GL-8000

      0.25

      Continuous dosing

      Non oxidizing bactericide

      GL-RO180

      5

      Reverse osmosis acid cleaning agent

      GL-132

      5%

      Dosing during cleaning

      Reverse osmosis alkaline cleaning agent

      GL-131

      5%

       

      RO system operation data:


      date

      Pressure(MPa)

      Flow(m3/h)

      Conductivity(μs/cm)

      Desalination rate%

      Recovery%

      Water temperature℃

      inlet

      Inter segment

      Concentrated water

      Water production

      Concentrated water

      inlet

      Water production

      2013.7

      1.0

      0.80

      0.90

      130

      43

      1100

      11

      99

      75

      25

      2022.1

      1.1

      0.90

      0.90

      120

      40

      1000

      50

      95

      75

      21


      Project operation effect

      The desalted water system of the power plant is the largest desalted water treatment system in the whole northwest, with a treatment water volume of 1800 tons per hour. The system has been operated by our company since it was put into operation in 2013. After years of mature operation and management experience and excellent pharmaceutical quality, our company has continuously and stably produced up to standard water for the whole magnesium Industrial Park for many years, ensuring the safe, stable, long, full and excellent operation of the production plant. After nearly ten years of operation, ultrafiltration, reverse osmosis and EDI equipment are basically not replaced, which saves a lot of membrane replacement and daily operation and maintenance costs for the workshop.


      Real scene of the project site

      1652336766923823.jpg


      1652336784146338.jpg


      Pre:China Coal jiuxin coking wastewater treatment and transportation guarantee project
      Next:Shaanxi Huadian coal mine evaporative crystallization system project
      Share to:
      RM新时代登录网址

      1. <strong id="ssxhz"><i id="ssxhz"><label id="ssxhz"></label></i></strong>

        <form id="ssxhz"></form>
      2. <label id="ssxhz"></label>

        1. <strong id="ssxhz"><i id="ssxhz"><label id="ssxhz"></label></i></strong>

          <form id="ssxhz"></form>
        2. <label id="ssxhz"></label>

          rm理财 新时代app官方下载最新版 RM新时代正规平台入口 RM新时代首页 RM新时代专业团队