RM新时代登录网址

    1. <strong id="ssxhz"><i id="ssxhz"><label id="ssxhz"></label></i></strong>

      <form id="ssxhz"></form>
    2. <label id="ssxhz"></label>

      Yankuang Group industrial wastewater zero discharge guarantee projectReturn

      Project Name: Yankuang Group XX Chemical Co., Ltd

      Project process: heating + stacked filtration + ultrafiltration + reverse osmosis + cation bed + anion bed + mixed bed

      Water yield: 600m3 / h

      Water source: Yellow River water

      Service time: July 2019 to now


      System operating conditions

      Dosing scheme:

               Chemical name                model           Dosage (mg / L)           Dosing mode
      Reverse osmosis scale inhibitor 8x concentrate            GL-8000                    0.25         Continuous dosing
      Non oxidizing bactericide              GL-180                       5
      Reverse osmosis acid cleaning agent              GL-132                       5%     Dosing during cleaning
      Reverse osmosis alkaline cleaning agent              GL-131                       5%


      Operation data:

      datePressure (MPA)Flow (m3 / h)Conductivity( μ s/cm)Desalination rate%Recovery%Water temperature ℃

      inletInter segmentConcentrated waterWater productionConcentrated waterinlet
      Water production



      2019.70.910.82
      0.73
      135
      3593021.397.779
      25
      2022.10.920.830.741333795026.397.27821


      Project implementation effect

                 After 3 years of operation, the desalination rate still exceeds 97%. With the joint efforts of both parties, Shandong Dadu New Material Co., Ltd. effectively reduced the risk of scaling and fouling in the system, reduced the cleaning times, ensured the high desalination rate and recovery rate of the membrane system, reduced the regeneration times for the subsequent ion exchange process, reduced the labor intensity and saved the cost.


      Real scene of the project site

      1652433564240351.jpg


      1652433790411012.jpg

      Pre:Operation guarantee project of steelmaking water system of Yukun iron and Steel Group
      Next:China Coal jiuxin coking wastewater treatment and transportation guarantee project
      Share to:
      RM新时代登录网址

      1. <strong id="ssxhz"><i id="ssxhz"><label id="ssxhz"></label></i></strong>

        <form id="ssxhz"></form>
      2. <label id="ssxhz"></label>

        1. <strong id="ssxhz"><i id="ssxhz"><label id="ssxhz"></label></i></strong>

          <form id="ssxhz"></form>
        2. <label id="ssxhz"></label>

          rm理财 新时代app官方下载最新版 RM新时代正规平台入口 RM新时代首页 RM新时代专业团队